Tottenham Court Road Station – Laing O’Rourke Construction Ltd; and Lend Lease Construction; Dr. Sauer Group (Consultant); architect TBC.

Concrete cast in-situ, loadbearing walls with columns – panels of 2×2 meters, 40 cm thick. Columns – steel sections needs to be inserted in the columns; columns cast in steel molds

Concrete – ready mixed (mix TBC); 24 hour cure