Ao Tan_Construction site material exercise

 

Project: 73 Charlotte Street

Client: Derwent London

Designer: Elliot Wood Partnership LLP, DSDHA

Contractor: Bagnall Limited
IMG_7950

 

Key component: panel slab framework – beam. 150x10x30. 5kg.

IMG_7951

Material study: aluminium;

Advantages:strong material, Light, Expensive.  It’s use as it is a re-usable component (only supporting the casting of the concert floor), and needs to be dismantled and reassembled thus needs to be light and strong.

IMG_7942IMG_7940

It is restored on the side of the building and lifted by the crane when it is being used.

IMG_7944

It is assembled and located freely. There is no joints to stablize the elements in the middle.