wk02 site photo – Yonathan Moore

Project info: 11 Soho street; Architect: Allford Hall Managhan Morris; Civil and structural engineer: The Walsh Group; Mechanical engineer: MTT;  contractor: Waters construction.

explanation of building component: panel slab framework – beam. 150x10x30. 5kg.

 

http://www.peri.ltd.uk/products.cfm/fuseaction/diashow/product_ID/44/currentimage/4/productcategory_ID/11/app_id/4.cfm

 

material study: aluminium;  fabrication : The company Peri manufactures most of it’s products in it’s production plant in Weissenhorn.

Hollow beam, strong material, Light, Expensive. Good for it’s use as it is a re-usable component (only supporting the casting of the concert floor), and needs to be dismantled and reassembled thus needs to be light and strong. It has a shape made to interlock with other components of the slab panel easily, with abilities of self drainage.

 

 

http://www.peri.ltd.uk/products.cfm/fuseaction/diashow/product_ID/44/currentimage/7/productcategory_ID/11/app_id/4.cfm

 