Building: 5 Broadgate, City of London

Architect: Make architects

Engineer: Buro Happold

Contractor: Mace

Element:Perforated metal beams, roughly 4m long and 40cm deep, joint with other beams and metal slabs.

Material: Steel, prefabricated in factory and transported to the construction site. Cross section is shaped as an I and optimised with circle cuts on the thinnest part to take some weight away.  This type of optimised beam is called cellular beam: it can be either fabricated in two parts, which are welded together, or a single part from which the circles are cut off.