Client: The British Land Company plc
Architect: Rogers Stirk Harbour + Partners
Structural Engineer: Arup
Contractor: Laing O’Rourke
Building Components: Prefabricated Nodes
Material Properties: Steel alloy, fabricated via ‘rolling’ offsite, coated with epoxy intumescent for corrosion and fire protection. These are then easily constructed on site with various fixings, such as bolts to allow for minimal welding.